Developing renewable energy infrastructure across Tasmania and Australia.

Pipers River, Tasmania
7 MW Solar + 22 MWh BESS | Export: 4.95 MW | Cost: $14 Million | Construction: Q3 2026
TPS Energy's first utility-scale solar farm, located in the North East of Tasmania. The project includes a 7 MW solar array and 22 MWh Battery Energy Storage System, exporting 4.95 MW directly into TasNetworks' electricity grid. The annual average output of 8 GWh will power approximately 1,000 Tasmanian homes.
Learn More
Dilston, Tasmania
7 MW Solar + 20 MWh BESS | Export: 4.95 MW | Cost: $14 Million | Construction: Q2 2027
Located on John Lees Drive in Dilston, Tasmania, this project is developed in two phases. Phase 1 delivers a 20 MWh battery energy storage system for grid stability and peak demand support. Phase 2 adds a 7 MW solar PV array, creating an integrated renewable energy solution with a combined export capacity of 4.95 MW.
Learn More
Multiple sites, Tasmania
100–200 kW Solar per site | 100–400 kWh BESS per site | Multiple C&I properties
A pipeline of distributed rooftop solar and battery storage deployments across commercial and industrial properties in Tasmania. Each site is tailored to the facility's specific energy profile, reducing electricity costs, increasing energy independence, and contributing to Tasmania's clean energy transition.
Learn More